How to collect website content from clients

By The Onbo team · Updated

Short answer

Collect website content as part of onboarding, not after design. Agree in the agreement who writes each page, build a content plan with an owner and due date per page, tie those dates to build and payment milestones, give clients a structure to write into and let reminders ask only for what's missing.

Ask any web designer what delays their projects and content comes up first. The design is approved, the templates are built, and the site sits waiting for an About page the client has been “finishing” for six weeks. Content delays are predictable, which means most of them can be prevented during onboarding.

Why are clients late with website content?

  • Writing is harder than expected. Clients underestimate how long good copy takes.
  • Nobody owns it. Content is “the marketing team’s job” until the marketing team is one busy person.
  • The request is vague. “Send your content” doesn’t say what, how much or in what form.
  • There’s no real deadline. “When you can” competes with everything else in their week.
  • It arrives all at once, or not at all. One deadline for every page means one big task that’s easy to postpone.

Notice that none of these is about clients not caring. They’re about structure, which you can provide.

Who should write the website copy?

Decide this before work starts and put it in the agreement. Common options:

Option Works well when Watch for
Client writes everything The client has a writer or strong existing copy Ownership and dates must be very clear
You write it as an add-on The client is busy or unsure Price it as its own deliverable
Shared The client supplies facts; you shape the copy Agree who has the final say
Existing copy reused A redesign with good current content Audit what’s worth keeping first

Offering copywriting as an option gives clients a clear way out when writing stalls, instead of silence.

How do you plan content during onboarding?

  1. Agree ownership in the agreement, including what happens to the timeline if content is late.
  2. Build a content plan from the sitemap. Every page gets an owner and a due date.
  3. Stagger due dates to match the build order, so the homepage content isn’t due on the same day as the blog posts.
  4. Tie dates to milestones. Content for the first pages before design approval; the rest before the launch payment.
  5. Give clients a structure. For each page, list the sections and roughly how many words each needs.

Content Snare, which positions itself around gathering content and documents from clients, describes this kind of planning as a content workflow, and has advice on briefing clients who struggle to give direction.

For example, a three-person web studio might send a page-by-page content plan with the onboarding questionnaire. The client sees that the homepage and services copy are due before design review, while case studies can follow two weeks later, so the first deadline feels small enough to meet.

What does a content request look like?

For each page, send:

  • The page name and its purpose
  • The sections it will have, from the agreed structure
  • Rough word counts for each section
  • Any images needed, with sizes or orientation
  • Who owns the page
  • The due date, and what it unlocks
  • A place to upload or paste the content
  • A way to mark it “in progress” or ask a question
  • An example of a good answer, if helpful
  • Automatic reminders as the date approaches

How can you make writing easier for clients?

Most clients find a blank page harder than a set of questions. Instead of asking for “About page copy”, ask three questions: how the business started, who it serves and what makes it different. Their answers become a first draft you can shape. Share examples of the length and tone you’re aiming for, and accept bullet points where full sentences would slow them down.

What if content is still late?

Plan the fallbacks in advance so a late page doesn’t stop the whole launch:

  • Launch with agreed placeholders that the client replaces later.
  • Launch the finished pages first and add the rest after.
  • Switch to the copywriting add-on at the agreed price.
  • Move the date, as written in the agreement.

Our guide to client onboarding for web design agencies covers late content alongside the rest of the website flow, and the website client onboarding checklist lists every item to collect.

Content planning is one part of a website project kickoff, alongside the agreement, deposit, sitemap and timeline.

If the build is already finished and still waiting, see what to do when the client hasn’t sent website content.

Where Onbo fits

Onbo brings content into onboarding. After the client accepts your agreement and pays, your questionnaire can ask page by page, with autosave so clients can come back as they write, and file collection uploads images and documents straight into your Google Drive. Reminders follow up on unfinished steps automatically. Try it free for 30 days; see pricing.

Questions

Why are clients late with website content?

Writing is harder than clients expect, nobody on their side owns it, the request is vague and there's no date tied to anything. Most delays come from unclear ownership rather than unwillingness.

Who should write website copy?

Whoever is agreed in writing. Clients know their business best, but many need help; offering copywriting as a paid add-on gives them a clear alternative when writing stalls.

How do I get clients to send content on time?

Agree ownership and due dates per page in the agreement, give clients a simple structure for each page, tie due dates to the build schedule and use automatic reminders for missing items.